Project building under construction "Lehrter Bahnhof (Lehrter station)", Berlin. 2000 tons Layher Allround material are assembled for a 350 000 m³ working and support scaffolding.

 

The southeast tower of the Ulm cathedral was scaffolded with Layher Allround material. At the inside of the helm roof there is also a scaffold, which was coupled with the outside scaffold. Thus one reaches better stability without using anchors.
 
Mobile Allround Scaffolding at the Rennsteig tunnel, which is Germany's longest road tunnel. The Allround Scaffolding runs on rails and is used to fix the armouring.