| |


Innovations
Allround Scaffolding
The System
STAR Frame
Steel Toe Board
Scaffolding Decks
Application Examples
SpeedyScaf
Protective Systems
Rolling Towers
Event Systems
Ladders
Accessories
Software
Logistics






|
|
 Project
building under construction "Lehrter Bahnhof (Lehrter station)",
Berlin. 2000 tons Layher Allround material are assembled for
a 350 000 m³ working and support scaffolding.
|
|

The southeast tower of the Ulm cathedral was scaffolded with Layher
Allround material. At the inside of the helm roof there is also
a scaffold, which was coupled with the outside scaffold. Thus one
reaches better stability without using anchors. |
|